Requirements

Leasehold improvements as a qualifying E-2 investment

By Daniel AydınHead of LegalTech, Plansera AIUpdated October 29, 20269 min read

Leasehold improvements as a qualifying E-2 investment

Leasehold improvements — the build-out work a tenant pays for to make a rented commercial space suitable for the business — are among the most common and most frequently misunderstood categories of E-2 qualifying investment. Retail stores, restaurants, clinics, salons, fitness studios, and dozens of other business types commit a large fraction of their startup capital to carpentry, plumbing, electrical work, flooring, and signage before a single customer walks through the door. Understanding exactly when those expenditures count, how to document them, and what can disqualify them is essential to building a defensible investment case.

The governing standard is found in 8 CFR 214.2(e)(12) and elaborated in 9 FAM 402.9-6. Capital qualifies when it has been irrevocably committed to the enterprise and is subject to partial or total loss if the business fails. Leasehold improvements satisfy that test in most circumstances — once concrete is poured or walls are framed, the money cannot be recovered — but several edge cases require careful attention.

Free tool: E-2 eligibility checkAnswer nine quick questions for an instant, plain-English read on how your case lines up with the core E-2 requirements.

The regulatory basis for including leasehold improvements

Under 9 FAM 402.9-6(B), qualifying investment includes all capital placed at risk for the purpose of generating a return in a bona fide commercial enterprise. The Foreign Affairs Manual does not limit investment to equipment or inventory; it covers any form of capital, including improvements to leased premises, provided the capital is irrevocably committed and genuinely at risk.

Leasehold improvements meet both conditions. They are irrevocably committed because the physical improvements become fixtures of the landlord's property — the investor cannot load drywall into a truck and recover the outlay. They are at risk because their value is tied entirely to the success of the business: if the enterprise fails and the lease is surrendered, the investor loses the build-out investment along with everything else. USCIS and consular officers routinely accept documented leasehold improvements as part of the qualifying investment total under these principles.

The key statutory hook for the at-risk requirement is 8 CFR 214.2(e)(12), which requires that the invested capital be 'subject to partial or total loss if investment fortunes reverse.' Tenant improvements fit squarely within this language because they are non-recoverable once installed.

What counts and what does not

Qualifying leasehold improvements are physical alterations or additions to the rented premises made for the purposes of the investor's business. Examples that regularly appear in successful E-2 filings include: commercial kitchen installation, plumbing rerouting, HVAC upgrades, electrical panel upgrades and branch circuits, partition walls and soundproofing, flooring (tile, hardwood, or commercial carpet), cabinetry and millwork, ADA accessibility modifications, and exterior or interior signage attached to the building.

Improvements that are not attached to the building — freestanding equipment, shelving, furniture, or display cases that can be moved out when the lease ends — are better categorized as equipment or personal property rather than leasehold improvements. They still qualify as E-2 investment, but under a different documentary framework. Mixing movable assets into a leasehold-improvement line item can confuse the investment breakdown and invite questions about recoverability.

Purely decorative spending — a painting that hangs on the wall, plants, or temporary displays — typically does not qualify because it is recoverable. Landlord allowances (TI allowances) also require careful handling: if the landlord is paying for the build-out and reimbursing the investor, those funds originated with the landlord, not the investor, and cannot be counted as the investor's qualifying capital under 9 FAM 402.9-6(C), which requires that the invested funds be owned by the treaty investor.

  • Qualifying: structural framing, concrete work, electrical and plumbing rough-in, HVAC, soundproofing, floor finishes, built-in cabinetry, ADA modifications, attached signage
  • Borderline (requires analysis): fixtures that can be removed without damaging the structure, equipment bolted to the floor but readily unbolted
  • Generally not qualifying as leasehold improvements: freestanding furniture, movable shelving, wall art, landlord-funded TI allowances

How tenant improvement allowances affect the calculation

Many commercial landlords offer a tenant improvement (TI) allowance — a cash contribution toward build-out costs that is typically structured as a rent credit or an upfront payment from the landlord to the tenant. The critical E-2 question is whose money is being counted. Under 9 FAM 402.9-6(C), the investment must consist of the treaty investor's own capital or capital borrowed by the investor at personal risk.

If the landlord pays for $80,000 of build-out work and the investor pays $70,000 out of pocket, only the $70,000 investor-funded portion counts as E-2 qualifying investment. The total build-out cost is $150,000, but $80,000 of that is the landlord's contribution. An investment exhibit that lists $150,000 as leasehold improvements without disclosing the TI allowance overstates the investor's qualifying capital and creates a misrepresentation risk if the officer or adjudicator later reviews the lease terms.

Best practice is to obtain the commercial lease and identify the TI allowance precisely, then construct the investment exhibit so it shows (a) total build-out cost, (b) landlord TI allowance, and (c) investor-paid amount — with the investor-paid amount being what goes into the qualifying investment total. This transparency also demonstrates that the investor understands the regulatory standard, which itself reflects well on the application.

Documentation requirements

Officers assessing a leasehold improvement investment need to see (1) that the work was completed or is contractually committed, (2) that the investor paid for it, and (3) that the funds are traceable to a lawful origin. The documentation package should address all three.

For completed work, include: the signed contractor agreement or scope-of-work document, itemized invoices for each trade (general contractor, electrician, plumber, HVAC contractor), proof of payment matching each invoice (bank wire confirmation, cancelled check, or credit card statement), and, where available, a certificate of occupancy or city inspection sign-off confirming the work passed local building inspection.

For pre-opening work that is contracted but not yet complete at the time of filing, include the signed contract, any deposit payments already made with proof of transfer, and the contractor's timeline. Under 9 FAM 402.9-6(B), capital is 'committed' when it has been placed at risk — a signed contract requiring payment is a commitment even before the check clears, though officers give more weight to payments actually made.

The source of funds for the build-out payments must trace back to the investor's documented lawful sources, using the same chain-of-title analysis applied to any other investment capital. Wire records should show the investor's personal or entity account sending payment to the contractor, not a third-party account that could raise questions about whose capital is actually at risk.

Valuation: contractor bids versus actual costs

Where improvements are complete, the qualifying investment amount is the actual cost, supported by invoices and payment records. Where improvements are projected (pre-opening filings), the investment schedule must show a realistic cost estimate, and the standard tool is third-party contractor bids obtained in writing.

Officers and adjudicators are skeptical of self-generated cost estimates. A spreadsheet that says 'kitchen installation: $45,000' without a contractor bid or industry reference does not establish that $45,000 is the actual market cost. A signed bid from a licensed commercial contractor, specifying labor and materials, carries substantially more evidentiary weight.

For businesses with significant build-out components — restaurants, medical clinics, fitness centers, salons — obtaining at least two or three contractor bids before filing is advisable both for the E-2 application and for the investor's own budget management. If one bid is selected, include all bids received so the officer can see the investor evaluated the market rather than accepting an inflated estimate from a related party.

The proportionality and substantiality analysis

Leasehold improvements count toward the total investment for purposes of both the substantiality test and the proportionality test under 9 FAM 402.9-7. The proportionality test, drawn from Matter of Walsh & Pollard, 8 I&N Dec. 288 (1959), compares the investor's capital to the total cost to fully establish the business. The more capital-intensive the build-out, the more the investor must commit to satisfy proportionality.

For a capital-intensive business like a full-service restaurant requiring $300,000 in build-out, the qualifying investment must be a substantial proportion of that total — typically the entire amount or close to it for a new enterprise. Investing $40,000 in equipment alone while relying on a landlord to fund $260,000 of build-out would not demonstrate the investor's commitment of substantial capital.

Conversely, a service business with minimal build-out (a consulting firm, a technology company, a bookkeeping practice) has a lower threshold because the total cost to establish the business is lower. The leasehold improvement category thus interacts directly with the proportionality analysis: the correct investment total, and the correct minimum qualifying amount, depend on an accurate and complete accounting of all build-out costs.

Common mistakes and how to avoid them

The most frequent error is counting the full contract price when only a deposit has been paid. If a contractor agreement totals $120,000 but the investor has paid a $15,000 deposit at time of filing, only $15,000 is currently at risk. Listing $120,000 as a committed investment when $105,000 remains to be paid is an overstatement — and one that an officer reviewing bank records will notice immediately.

A second common error is failing to trace leasehold improvement payments back through the source-of-funds chain. Investors sometimes pay contractors directly from a business operating account funded by a recent wire from a personal account. If the personal account wire is not documented, the investor's payment chain shows money appearing in a business account without explanation of its origin. Every dollar entering the investment chain must be traceable.

Third, investors occasionally include landlord-funded improvements in the investment total without disclosing the TI allowance, as discussed above. Even if unintentional, this overstates qualifying investment and can lead to a request for evidence, a notice of intent to deny, or — if the application proceeds on inaccurate financials — a later revocation or refusal at renewal.

Fourth, some investors mix leasehold improvements with equipment on a single line item labeled 'build-out.' Separating the two categories — improvements to the structure from equipment installed within it — gives the officer cleaner evidence to evaluate and reduces the risk that a question about one category contaminates the other.

Leasehold improvements at renewal

At an E-2 renewal (either a USCIS I-129 extension or a consular stamp renewal), the leasehold improvements continue to support the investment showing as long as the investor can demonstrate they were paid, they are in place, and the enterprise is operating. Officers reviewing a renewal do not require a new investment of equivalent magnitude; they review whether the original investment was real, whether the business is active, and whether it remains non-marginal.

If the investor has made additional improvements during the visa period — for example, a second build-out phase or an expansion into adjacent space — those expenditures should be documented and included in the renewal package as evidence of the enterprise's continued growth and the investor's ongoing capital commitment.

One renewal issue specific to leasehold improvements: if the lease expires during the E-2 period and the investor relocates the business, the improvements at the original location are permanently lost. This does not invalidate the original qualifying investment, but the renewal package should explain the relocation, document any new build-out at the current location, and confirm that the enterprise itself continues as a going concern.

Frequently asked

Do leasehold improvements count toward my E-2 qualifying investment?
Yes. Under 9 FAM 402.9-6(B), qualifying investment includes all capital irrevocably committed to the enterprise and at risk of partial or total loss. Leasehold improvements satisfy both conditions: they become part of the landlord's property and cannot be recovered if the business fails. They must be documented with contractor agreements, invoices, and proof of payment.
My landlord is giving me a TI allowance to cover part of the build-out. Does that reduce my qualifying investment?
Yes. Only capital that belongs to the treaty investor counts as qualifying investment under 9 FAM 402.9-6(C). If the landlord funds $60,000 of a $100,000 build-out through a TI allowance, the investor's qualifying contribution from that build-out is $40,000, not $100,000. The investment exhibit should itemize the total cost, the landlord's contribution, and the investor-paid amount separately.
What documents do I need to support leasehold improvement costs?
For completed improvements: signed contractor agreements, itemized invoices, and bank or wire records showing payment from the investor's account to each contractor. For projected improvements: signed contractor bids or a signed contract with deposit payments made. A certificate of occupancy or building inspection approval strengthens the record where available.
Can I count the full value of a signed build-out contract even if I haven't paid yet?
A signed contract represents a commitment, but officers give substantially more weight to payments actually made. Under 8 CFR 214.2(e)(12), the capital must be subject to risk — money still in your bank account is not yet at risk. The safest approach is to have a significant portion of build-out payments made at time of filing, with the contract covering the remainder.
How do leasehold improvements interact with the proportionality test?
Leasehold improvements are included in the total cost to establish the business, which is the denominator in the proportionality analysis from Matter of Walsh & Pollard. A capital-intensive build-out raises the minimum qualifying investment because proportionality requires investing a substantial portion of the enterprise's total establishment cost. Accurately counting all build-out costs — including improvements the landlord funds — is important for calculating the required investment correctly.
If my business relocates and the old build-out is lost, does that hurt my renewal?
The loss of improvements at a prior location does not invalidate the original qualifying investment, which was real and at risk at the time it was made. For renewal purposes, document the relocation, explain the business reasons, show the current premises' lease and any new build-out investment, and demonstrate that the enterprise continues operating as a going concern.

Educational information, not legal advice. This guide is for general educational purposes only and is not legal advice. Plansera AI is not a law firm and does not provide legal representation. E-2 eligibility is fact-specific and the rules change — verify against current primary sources (9 FAM 402.9, 8 CFR 214.2(e), and USCIS) and consult a licensed U.S. immigration attorney before relying on any of it or filing.

Draft an E-2 plan that proves it

Plansera turns your client’s documents into an evidence-grounded, eligibility-checked business plan.

Start a plan

Related guides

E-2 visa leasehold improvements as investment · Plansera AI